current location: home > News and information > Reselection of knowledge
update date :2023-07-26 15:43:04Number of views: author:huang
The installation and construction plan for spiral chutes is as follows: 1. Introduce the steps of mineral sorting in the chute, which belongs to inclined flow sorting. Mineral mortar is provided on a partially inclined chute or inclined surface. With the assistance of water, the mineral particle group is not tightened and layered. The lighter mineral material on the upper part is quickly discharged to the outside of the chute, while the heavier mineral material on the lower part stays in the inner groove or flows out at a slow speed from the lower part. After being obtained separately, concentrate and tailings are obtained. The fiberglass spiral chute is an equipment for mining and beneficiation, making it ideal for mining sand mines in coastal areas, riverbanks, sandbanks, and streams. The product also has the characteristics of reasonable structure, simple installation, less land occupation, simple operability, stable beneficiation, clear screening of ore, large processing output, high efficiency, high beneficiation concentration ratio, high recovery rate, and reliable operation. It has the advantages of light weight, moisture prevention, rust prevention, corrosion prevention, and strong applicability to feed volume, density, Granularity, and grade fluctuation. 2、 The usage method is to make the fiberglass chute stand up, align it with the vertical line, fix it in the appropriate position with an iron frame or wood, and send the sand ore to the two feeding ports on the top of the spiral through a slurry pump. The water is added and the mineral slurry concentration is adjusted. The mineral slurry naturally swirls from high to low, and an inertial centrifugal force occurs in the rotating inclined flow rate, which is distinguished by the gravity, particle size, and state of the mineral sand, By utilizing the gravity or centrifugal force of the swirling flow, the ore and sand are separated. The selected ore flows into the concentrate hopper and is piped out, while the tailings flow into the tailings hopper and are moved to the sand pit through a pipeline. Then, they are discharged by a mortar pump, completing the entire beneficiation process. Installation and Construction Plan III, Characteristics and Advantages of the Spiral Chute: 1. Large scale and strong processing capacity. Currently, mineral processing objectively allows for the creation of profits on a large scale. 2. Fine granulation refers to the treatment of fine-grained mineral materials, especially for minerals with a particle size of -0.047mm. The original machine could generally ensure the recovery of a particle size of+0.047mm. 3. With the development of Hydraulics, two-phase flow, machine vibration, etc., the spiral chute has developed from the simple application of gravity and flow resistance to the composite application of centrifugal force, equipment vibration force, magnetic force, etc. By using a composite force field, the enrichment of useful mineral materials and the separation of fine particles and micro particles are increased, thereby improving the mineral recovery rate. 4. Based on energy conservation and environmental protection, the land area and space occupied should be small, and water and electricity consumption should be small. 5. Simple and flexible operation, stable sorting process, simple structure, and convenient maintenance management. Spiral chute installation construction plan 4. Classification: According to the particle size of the processed ore, the chute can be divided into three types: (1) Coarse grained spiral chutes, with a maximum particle size of 2-3mm or more for ore feeding, and a maximum of 100-200mm. (2) Sand ore chute, processing 2-3MM particle grade ore. (3) Slurry spiral chute, feeding Granularity<0.074mm. 5、 The application scope of this machine is to separate iron, ferrotitanium, chromite ore, pyrite ore, zircon ore, Rutile ore, monazite ore, phosphorus, tungsten ore sand, cassiterite, tantalum niobium, niobium ore or other non-ferrous metal ore, rare metal or non-metallic ore body with gravity difference from 0.3-0.02mm fine material. Spiral Chute Installation Construction Plan Spiral Chute Installation Construction Plan
Installation and Construction Plan for Spiral Chute